Microsoft Office Home & Student 2021 WW
Microsoft Office
182846 182846 182846 Microsoft MICROSOFT OFFICE HOME & STUDENT 2021 WW is a digital code with FREE Shipping and no expiry date. Once bought, we will email the product key, instructions & links for Instant Download! No time limit, no subscription, and 24/7 support with installation and activation.Product Region:
Platform:
$ 96.25
MICROSOFT OFFICE HOME & STUDENT 2021 WW is a digital code with FREE Shipping and no expiry date. Once bought, we will email the product key, instructions & links for Instant Download! No time limit, no subscription, and 24/7 support with installation and activation.
$ 96.25
IMPORTANT!: THIS PRODUCT IS NOT COMPATIBLE WITH APPLE MAC OS, ANDROID DEVICES AND CHROMEBOOKS.
Languages: See full list of languages available
✔ Compatible with Windows 10 or 11
✔ NO TIME LIMIT, NO SUBSCRIPTION
✔ 24/7 FREE support available during installation and activation
Microsoft Office Home and Student 2021 is an essential suite of productivity tools that empowers students and families to accomplish more in less time. With a wide range of features and functions designed to streamline your workflow and maximize your efficiency, Office Home and Student 2021 is the ultimate choice for anyone looking to get ahead.
Featuring the latest versions of Word, Excel, and PowerPoint, Office Home and Student 2021 gives you the power to create professional-quality documents, spreadsheets, and presentations that are sure to impress. And with OneNote and OneDrive at your disposal, you'll have all the tools you need to organize your thoughts, store your files, and collaborate with others.
In short, Microsoft Office Home and Student 2021 is a powerful suite of tools that helps students and families achieve more in less time. With its wide range of features and functions, Office Home and Student 2021 is the ideal choice for anyone looking to boost their productivity and get ahead.
Available Languages
English, German, French, Italian, Polish, Czech, Dutch, Japanese, Korean, Norwegian, Portuguese, Russian, Chinese, Spanish, Swedish, Turkish, Hungarian, Danish, Romanian, Arabic, Finnish, Greek, Bulgarian, Ukrainian, Thai, Vietnamese.
System Requirements for Microsoft Office Home and Student 2021
• Processor: Windows 11 or Windows 10 with 1.6 GHz, 2-core processor/recent macOS
• Operating system: Windows 11 or Windows 10
• Memory: 4 GB (64bit), 2 GB (32bit) RAM for PC
• Hard disk space: 4 GB available disk space for PC
• Display: 1024 x 768 resolution for PC
• Graphics: DirectX 10 graphics card for graphics hardware acceleration for PC
• Additional system requirements: Internet access and Microsoft account
New to Livecards.net? Buying digital codes is quick and easy:
Watch the quick guide above, or follow the steps below 👇
• Choose your product
• Enter your email address
• Select your preferred payment method
• Complete your order
Once done, you’ll receive an email with a secure link to access your code.
- Pre-Order products will be delivered before or on the release date mentioned, while items in-stock will be delivered instantly pending security checks.
- Purchases considered to be for commercial use will not be accepted.
- You are buying a digital product only.
- For more information please check out our FAQs.
- If you experience any problem with a purchase, please notify us using our Contact Us form.
- These downloadable codes are produced by the game's developer and are therefore original.
- These codes have no expiry date.
- Downloadable Content or DLC products - You must have the original game in-order to play this expansion.
- You may receive more than one code for some products.

